Photos & Video

Photos

Completed inlet pipe assembly and final pressure test, performed by onsite engineer, on newly installed pipe on April 13, 2015

Crews mitigating the weather with tents and heaters and workers grouting the casing pipe on March 17, 2016

Vac truck used for casing pipe cleaning and small equipment used to remove any unsuitable material on March 15, 2016

Dam being built around site to control ice melt from saturating the work area; steel sleeve being cleaned for TV inspection on March 13, 2016

Montana FWP sampling team on March 11, 2016

Montana FWP Sampling Team


MDEQ engineer inspection and YC, Confluence Engineering and Gallatin River Task Force testing water below pond on March 9, 2016

Engineers inspecting breach location on March 9 at 1:00 p.m. EST 

3-9-16 Engineers inspecting breach location.jpeg


Breach location as of March 8 at 9:00 a.m. EST and Second Mule Creek as of March 7 at 3 p.m. MST

Breach location and South Fork as of March 7, 2016 as of 9:20 a.m. MST

 Breach Location as of March 6, 2016 at 9 a.m. MST

Breach Location on 3-6-16 as of 9 a.m


Breach Location as of March 5, 2016 at 6 p.m. MST

Additional Photos

Video: Breach Location Outside of Pond on March 6, 2016 as of 6 p.m. MST


Video: Breach Location Outside of Pond on March 3, 2016